Electricity in Albania: the 700 kWh threshold and why it works as a cliff

The household electricity tariff in Albania has two prices: 8.5 lekë per kWh and 9.5 lekë. The line between them is 700 kWh a month. The prices are quoted without VAT; the standard rate is 20%.
The important part is not the figures but how the crossing works. It is not a step, it is a cliff. The note to the official table says it plainly: anyone consuming 701 kWh or more pays 9.5 lekë for the whole month's consumption, not only for the excess.
Work out what that means. 700 kWh costs 5,950 lekë. 701 kWh costs 6,659.5 lekë. One extra kilowatt-hour costs about 710 lekë.
This is why a winter bill sometimes doubles for no visible reason: a heater left on for an extra week dragged you over the line. If your consumption sits around 650–700, watching the meter at the end of the month is not penny-pinching, it is hundreds of lekë.
The tariff was approved by the regulator and runs until 31 December 2026. No decision for 2027 has been taken as of today; in each of the last two cycles it came in mid-December.
Water and waste in Tirana. The household tariff is 65 lekë per cubic metre of water plus 11 lekë for sewerage, and a fixed charge of 200 lekë a month. Cleaning is 417 lekë a month, billed on the water bill. So about 617 lekë accrues before you have turned on a tap.
Now the part that matters most if you rent.
The electricity contract can be in your own name — a rental agreement is on the list of documents the supplier accepts. Changing the name on the contract costs 300 lekë.
And here is the thing that lands people in someone else's debt: the supplier contracts only with a person who is not a debtor to it, and the debt sits on the connection point, not on the person. Before signing a lease, ask for the latest bill and make sure nothing is outstanding on the meter. Otherwise untangling a stranger's arrears becomes your problem.
The standard contract requires no deposit for electricity. If a landlord asks for one, that is their private condition, not the supplier's rule. A new contract on already-connected premises must be concluded within 7 days of a complete application.